Loading ...

S247 Architects

Signature Tower

Type
Mixed-use
Client
Dong Do Joint Stock Company
Land area
340 m2
Construction area
1.500 m2
Status
Concept Design
Location
Ha Noi, Viet Nam
Year
2020
Collaboration
Xuan Lam NGUYEN - Hoang NGUYEN

The Signature project is more than just a daring architectural design—it holds significant importance due to its prime location near the heart of Hanoi. Positioned at the intersection of major arterial roads, adjacent to the new “Giang Vo” urban area, this building represents a forward-looking, modern vision of urban development. As a mixed-use structure, Signature integrates multiple functions within a single space. Its hallmark glass facade, combined with transparent LED advertising screens, creates a striking urban landmark in the city’s dynamic environment.

Design Highlights:

  • Dynamic Urban Context:Moving away from conventional monotony, the design capitalizes on its surroundings—a structure nestled amid open spaces and diverse architectural styles—to establish a vibrant urban energy. A dynamic facade combined with minimalist massing ensures the building stands out both during the day and at night.
  • Innovative Facade Design:The southeast-facing glass facade, embedded with transparent LED screens, not only shields the interior from excessive sunlight but also keeps the indoor spaces cool. Meanwhile, the southwest facade features solid surfaces with planted balconies, fostering a natural and eco-friendly connection.
  • Three-Dimensional Architectural Language:To enhance flexibility, the design goes beyond the flat 2D screen concept, incorporating 3D blocks for a unique architectural language. This innovative approach brings a new dimension to urban design in Hanoi.
  • Efficient Functionality:To optimize the compact site, the project replaces conventional parking ramps with car elevators. This solution saves construction space and increases the parking capacity, ensuring efficient land use.

 

Other projects

  • Hospitality & Leisure
  • Completed
  • 2021-2022
  • Office
  • Completed
  • 2024
  • Mixed-use
  • Under Construction
  • 2023 - 2025